2759-291/211-1000
Function:The IEC 60870 protocol communication can be conveniently parameterized using the configurator. To enable this, the CODESYS V3 development environment must be extended once with the WAGO Telec...
<p><b>Function:</b></p><p>The IEC 60870 protocol communication can be conveniently parameterized using the configurator. To enable this, the CODESYS V3 development environment must be extended once with the WAGO Telecontrol Package.</p><p>The configurator sets up IEC 60870 objects while configuring data exchange to the PLC application or I/O modules. Import and export functions in CSV format allow configured data to be transmitted to other engineering tools.</p><p>This license activates the IEC 60870-5-101 and -104 protocols on the slave side. It enables the creation of gateways for protocol conversion, e.g., reading protection devices via Modbus and forwarding the data to a control system using IEC 60870-5-104.</p><p>Time synchronization of telecontrol substations (slaves) can be performed via the IEC 60870 protocol using object 103, or alternatively via (S)NTP.</p><p>IEC 60870-5-101/-104 information objects can be used to monitor the direction of single, double and step messages, as well as bit patterns,</p><p>counter values, and normalized, scaled, or floating-point measurement values. All information objects can be transmitted with or without timestamp. This also applies to information objects in the control direction.</p><p> </p><p>An IEC 60870-5-104 slave can simultaneously maintain up to four connections to the control system (master).</p><p> </p><p><b>Key Benefits:</b></p><ul><li>Use the PFC200 Controller as a telecontrol substation (slave) on an IEC 60870-5-101/-104 control system (master).</li><li>Create a gateway application to transfer data from Modbus protection devices to an IEC 60870-5-101/-104 control system.</li></ul><br/><p> </p><p><b>Usage:</b></p><p>The license is registered via WAGO Upload and loaded onto a device. No further installation steps are required.</p><p> </p><p><b>Technical Data:</b></p><p>See the section “Functionality of the WAGO Protocol Library according to IEC 60870-5-101, and -104” in the product manual “Configuring the IEC 60870 Protocol.”</p>
| Lifecycle status | active |